May 14
First, I've added in the missing industries for Upper Blackhawk and Central City.
Spiking Upper Blackhawk continues (I hope to have it done by the end of this next week),
Most of the wiring for the track from Forks to Lower Blackhawk (all I have left to do is
install the electrical switches and piano wire under the layout, so I hope to have it
done and fully tested with a DC power pack and engine by the end of this
next week), and continue working on the drop panel for the zone circuit breakers and
cut out switches.